It was
decided that the painting schedule should follow the rotating three-year
driveway blacktop schedule. The buildings to be painted/blacktopped in
2006 are numbers 1-10 and 36 (with the exception of Building 1 - it will
be omitted from the painting schedule on this rotation). The 2007
schedule is buildings 22-35; 2008 is building 11-21. The
painting of the gas meters will be included; painting cost is included in
the reserve assessment portion of the monthly dues. In order to keep
paint color and quality consistent entry doors will also be sanded and
painted, but as stated in the decs & bylaws entry doors are a homeowner's
responsibility and this portion of the coast will be charged back to them
via a special assessment.
Painting Schedule
|